Completed open office with patterned carpet tile, columns, perimeter rooms, and painted walls

Commercial Office · Process + Finish

Overland Park Office Refresh

An office refresh built from the floor up, pairing substrate preparation and carpet tile with paint, electrical, data, and partition work.

Project Type
Commercial Office Refresh
Space Condition
Unoccupied Suite
Primary Scope
Flooring + Interior Improvements

Built Around the Existing Space

Prepare the surface. Improve the systems. Refinish the suite.

Existing flooring was removed to expose the concrete slab. Mechanical preparation and residual-adhesive removal readied the substrate for carpet tile, vinyl base, and transitions.

Wall preparation, paint, four outlets, a relocated data line, and a partition extended the work beyond flooring throughout the unoccupied suite.

Existing carpeted open office with columns and adjoining rooms before the flooring refresh

The Flooring Sequence

From existing floor to finished suite.

The visual sequence follows removal, exposed concrete, preparation, patching, and carpet installation, showing how work beneath the finish supported the final surface.

01

Flooring Removal

Removal exposed the concrete substrate across the main office and adjoining rooms.

Open office with floor covering removed and concrete substrate exposed
02

Mechanical Preparation

Mechanical preparation addressed the substrate and residual adhesive before installation.

Floor preparation equipment operating across the exposed office floor
03

Localized Patching

Localized patches crossed open areas and wrapped existing columns, walls, and door zones.

Prepared floor with patch lines around columns and wallsBroad exposed floor with a grid of visible patch lines
04

Carpet Tile Installation

Carpet tile advanced through the suite around columns, thresholds, and adjoining rooms.

Beginning stage of carpet tile installation in the open officeCarpet tile installation progressing beside exposed substrate
05

Base + Finish Interfaces

Vinyl base and transitions completed the carpet at walls, doorways, and adjoining surfaces.

Close view of finished carpet tile meeting dark vinyl base and painted wall
Sequence matters

Removal exposed the slab; preparation readied it for installation; base and transitions completed the floor plane.

Finished room with Waterloo accent wall, Silverpointe field color, carpet tile, and adjoining circulation

Painting + Finish Updates

A quiet palette, carried room to room.

Patching, sanding, and spot priming prepared surfaces for the primary color, accent paint, and final touchups.

Prepare

Patch, sand, and spot-prime.

Primary

Silverpointe SW 7653.

Accent

Waterloo SW 9141.

Beyond the Floor

A broader interior scope.

Electrical

Three outlets at TV locations and one at an existing column.

Data

One data line relocated within the suite.

Partition Construction

An approximately 8-by-14-foot metal-stud and drywall partition prepared for paint.

Transitions + Base

Vinyl base and transitions completed the flooring at walls and doorways.

Metal-stud partition framing beside existing interior elements
Finished carpet and electrical-device interface at an existing column

Materials + Finish Details

Selections that bring the suite together.

A quiet carpet pattern pairs with a light primary wall color and deeper blue-gray accent.

Carpet Tile

Mainstreet by Philadelphia

Dynamo · Brilliant 57100

Primary Paint

Sherwin-Williams Silverpointe

SW 7653

Accent Paint

Sherwin-Williams Waterloo

SW 9141

Completed Office

A unified finish across open areas and private rooms.

The carpet pattern carries through the broad open office, around existing columns, and into perimeter rooms.

Completed open office with new carpet tile and perimeter rooms
Finished carpeted room viewed through interior glazing
Detail of carpet tile, dark base, and window-sill interface

Existing to Finished

The floor changes the way the whole suite reads.

Nearby viewpoints show the progression without implying a precision overlay.

Existing carpeted open office before the flooring refresh
Existing condition
Open office after installation of new patterned carpet tile
Finished suite

Approximate viewpoints; not a matched-angle slider.

Project Approach

Plan the interfaces before the finish.

Preparation, infrastructure, and finish work were sequenced around the suite’s existing conditions and connections.

  1. Protect + Prepare

    Prepare walls and floors while protecting adjacent areas.

  2. Integrate Infrastructure

    Add outlets, relocate data, and build the partition around existing conditions.

  3. Install + Finish

    Carry carpet tile, base, transitions, paint, and touchups through the suite.

  4. Maintain the Work Area

    Provide daily cleanup and remove debris at completion.

Plan the Next Space

Make the process visible—and the finished space cohesive.

Plan an office refresh around existing conditions and project priorities.

You’ve seen our work, now let’s see if we’re the right fit for your project. Tell us a few details and we’ll reach out to schedule your consultation. No pressure, no obligation.

Let’s Talk About Your Project

  • No pressure, no obligation

  • Quick 10–15 minute initial call

  • Clear next steps after we connect

We’re typically a great fit for homeowners planning mid-to-large remodeling projects.